Kabanga Nickel — Kabanga Project

Tanzania · Integrated · Permitting

TZ · TanzaniaAfricaPermittingIntegrated

Kabanga Nickel — Kabanga Project

BHP-backed greenfield. First major non-Indonesia/Russia Class-1 nickel project for 2027 first metal.

ESG score
74
0–100
Annual capacity
65k t/y
nameplate
Established
2021
5 years
FEOC status
Compliant
OFAC + EU + UK

Compliance signals

  • IRA §30D (US Treasury)Eligible
  • EU CRMA strategic projectNot eligible
  • OFAC consolidatedClear
  • UK HMT sanctionsClear
  • Beneficial ownershipVerified
Generate full evidence pack

Certifications & standards

IRMA
Initiative for Responsible Mining Assurance — independently audited mine-site standard.

Risk flags

  • Pre-production
Country risk context

Tanzania — improving mining code (2017–2024 reforms) and Western capital re-entry. Limited rail/port infrastructure.

Recent intelligence relevant to this supplier

3 items
  • 2026-05-25·Sanction·European Union
    EU 14th sanctions package: Norilsk Nickel partial restrictions extended

    Council Regulation (EU) 2026/823 extends import restrictions on Russian Class-1 nickel through Q2-2027. Existing long-term contracts grandfathered until 2026-12-31. EU OEMs accelerating substitution programs.

  • 2026-05-17·Geopolitics·DRC
    DRC mining code amendments raise state-equity threshold to 30%

    Parliament passed amendments to 2002 Mining Code requiring state participation of 30% in new strategic mineral projects (cobalt, copper, lithium). Existing concessions exempt; renewals subject. Glencore, CMOC, ERG concession renewals 2026-2028.

  • 2026-05-08·Geopolitics·Indonesia
    Indonesia formalizes raw-nickel export ban extension through 2030

    President signed Reg. 18/2026. Downstream value-addition mandate maintained. Chinese-built HPAL capacity now ~620ktpa Ni-eq, but ESG and FEOC issues block IRA qualification of most output.

Need a deeper diligence pack?

Our analyst desk delivers a 12-page diligence report on this supplier within 72 hours — beneficial ownership, audited capacity, in-region context, regulatory exposure and qualified offtake alternatives.

Commission diligence